Ballance Agri-nutrients - New Office Block
When New Zealand’s leading fertilizer manufacturer and distributor decided to centralise operations it needed a new office block. This three story office block is built from materials specially chosen to withstand the harsh chemical and coastal environment and was built for a total budget of $5m. This impressive structure consists of:
- A solid three story building.
- The sub floor foundation is 600mm with a 100mm thick concrete reinforced slab.
- The upper two levels rest on suspended concrete slabs.
- Reinforced concrete masonry supports the ground level while upper levels consist of steel frame structure together with concrete masonry shear walls.
- Special attention was made to the exterior cladding to meet both acoustic and aesthetic requirements.
- The complex is fully fitted with modern technologies including a mechanical elevator, fire protection, security and communications.
Ballance chose Partridge Construction for its management structure, site personnel and relevant experience. The company’s Health & Safety record was also important to Ballance, who take their own Health & Safety responsibilities seriously.
|
|